I hope that you enjoyed the January break as we have quite a big job on February Monday 5th

We are improving an existing path. It needs a few more steps, a considerable length of handrail, some levelling and some surfacing.

The site is off Twentywell Lane, which is just beyond Dore Station. Go over the bridge after the station and block of flats onto Twentywell Lane. Imediately over the bridge turn right. There is a gate which we will arange to be unlocked, but there is some parking before the gate. 9.45 if you can make it.

We will need the fixit drill and David’s drill. Saws hammers, spades&shovels, plastic buckets for transporting hardcore. Dreadlocks Dave will bring special tools

Arnold Laver have donated all the timber for this job.

HAPPY NEW YEAR