Fixit on May 8th will be back at Ringinglow Sheephill Road just over the stile on The Sheffield Round Walk. It is the same area where we sunk the drainage pipes. The job is to improve the drainage by digging out a trench and putting in another pipe. We will also be surfacing a section of the footpath. Please bring digging equipment. Wellies etc. Meet at 10 am or 9.45 If pos. See you there!