April 3rd FIXIT will be a return to Coomes Wood to firstly complete the steps,(10 more to do) and secondly, to dig a drainage channel under the dry-stone wall to get rid of water on the official right of way path.

I suggest we split into two groups to work on these tasks.

If there is time, there is cutback work further into the woods.

An additional job is to paint arrows on stone walls to indicate the official routes. Dave is bringing paint for this job. I shall make some arrow stensils.

Bring wellies, tools for step making. a crowbar would be useful for making a gap in the wall. spades and shovels for ditching and cutback tools may be required.

Dreadlocks Dave will be working with us. Tony is elsewhere.

See you at 10.00